KitLog pro

Powered By Kitlog Pro v2.0

THOMAS'S WEB SITE
' style=
Date:  5-26-2016
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Construction of Canopy Frame

Sanded D 107/2 for the perfect surface and broke all the edges. The tape that was used to hold the first Bsp2 lamella in place was a little obstinately. Really took me far too long to clean/sand it off.

Thereafter I blew the dust off with compressed air and cleaned it with a little bit of aceton. The carbon house was pushed in one piece onto the bow and soaked with resin. Peelply, separating foil and breather was applied together with the vacuum technic. For further details refer to the resin tables.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.